- May 2001, film #1
Installation of shutter doors for bay 5 at Los Leones
- May 2001, film #2
Installation of shutter doors for bay 5 at Los Leones, some pictures
of tanks in the Engineering Array and a few shots of the Andes and landscape.
- May 2001, film #3
Shots of details of support for lenses and work on some tanks in the field.
- July 2001
Works in the Pampas on the engineering array
- February/March 2002
CDAS/FDE school, work in the Pampas on the engineering array
- March/April 2003
Shutter and apperture box installation at Los Leones and Coihueco,
pre-production tank deployment